Biomi Holding carried out the relevant engineering works for the heating, cooling and ventilation systems.
Project specifics
One of the defining elements of the project is the open, industrial ceiling, where the engineering services are a visible part of the interior. Installing the ductwork therefore called for judgement about the visual concept of the space as much as for technical precision.
The solution
With the ceiling left open, the ductwork was laid out to suit both the functional zones of the space and the technical requirements. Particular attention went to the exact routing of the engineering services and to the quality of the installation.